STEGAL-MIDAL Natural Gas Pipeline System
DORSCH CONSULT was retained by Wintershall AG to plan the Rehden underground pore reservoir for gas storage including one compressor station. This involved extending the already extracted pore reservoir and connecting it to the core MIDAL/STEGAL natural gas pipeline system. The new underground storage reservoir is one of the largest of its kind in Germany.
The compressor station required for the input and withdrawal of the gas to and from the core system has the following capacities:
- Storage volume:
- 1st Development Stage 1.5 bn m3
- 2nd Development Stage 3.0 bn m3
- Withdrawal rate:
- 700 000 N m3/h
and comprises two gas turbine driven, radial turbo-compressor units. In addition the installation embraces the following structures:
- compressor hall
- gas volume meter station
Disciplines
- Industrial Engineering
- Oil & Gas
Companies
Dorsch Engineers GmbH
Client
Wintershall AG, Kassel
Duration
From 1991 to 1993
Location
Rehden, Germany
Project Activities
- Construction engineering
- all service phases for building construction
- Design of mechanical-electrical equipment
- heating and ventilation
- sanitary works
- electrical explosion protection
- Design of outdoor facilities
- civil engineering works
- roads and paths
- green space
- Site supervision
